VIII
★
112
The development of the 112 tank started in 1962. The project was to feature parts and components of medium and heavy tanks. Existed only in blueprints. The 113 tank was a further development of the 112.
♦
8,500
Gold
Modules
Gun
Turret
Engine
Suspension
Radio
Performance Stats
Firepower
Caliber
122mm
Damage (avg)
390HP
Penetration (avg)
196mm
Reload Time
12.60s
Aim Time
3.00s
Dispersion
0.440m
Rate of Fire
4.76/min
Depression
6°
Elevation
17°
Mobility
Top Speed
45km/h
Reverse Speed
15km/h
Hull Traverse
26°/s
Engine Power
580HP
Engine Fire Chance
0.1%
Survivability
Hit Points
1500
Hull Front
120mm
Hull Sides
120mm
Hull Rear
60mm
Turret Front
240mm
Turret Sides
130mm
Turret Rear
60mm
View Range
380m
Turret Traverse
26°/s
Signal Range
600m