X
E 100
In June 1943, the Adlerwerke company received an order for development of the E 100. However, in 1944, heavy tank development was discontinued. By the end of the war, only the chassis was completed, which was later captured by the British Army.
●
6,100,000
Credits
Modules
Gun
Turret
Engine
Suspension
Radio
Performance Stats
Firepower
Caliber
128mm
Damage (avg)
530HP
Penetration (avg)
255mm
Reload Time
12.00s
Aim Time
2.50s
Dispersion
0.370m
Rate of Fire
5.00/min
Depression
7°
Elevation
20°
Mobility
Top Speed
30km/h
Reverse Speed
15km/h
Hull Traverse
22°/s
Engine Power
1200HP
Engine Fire Chance
0.2%
Survivability
Hit Points
2700
Hull Front
200mm
Hull Sides
120mm
Hull Rear
150mm
Turret Front
280mm
Turret Sides
150mm
Turret Rear
150mm
View Range
400m
Turret Traverse
22°/s
Signal Range
720m