VII
M12
Development of the SPG started in the second half of 1941. The prototype underwent trials on February 12, 1942 and saw service in July 1942. The Pressed Steel Car Company produced 100 vehicles. Baldwin Locomotive Works modified the SPGs and re-equipped some M30 carriers. The vehicle saw service in the field artillery battalions and was used by the U.S.A. forces in Western Europe.
●
1,400,000
Credits
Modules
Gun
Engine
Suspension
Radio
Performance Stats
Firepower
Caliber
155mm
Damage (avg)
600HP
Penetration (avg)
39mm
Reload Time
28.50s
Aim Time
5.70s
Dispersion
0.690m
Rate of Fire
2.11/min
Depression
5Β°
Elevation
45Β°
Mobility
Top Speed
39km/h
Reverse Speed
10km/h
Hull Traverse
18Β°/s
Engine Power
400HP
Engine Fire Chance
0.2%
Survivability
Hit Points
350
Hull Front
51mm
Hull Sides
19mm
Hull Rear
19mm
Turret Front
βmm
Turret Sides
βmm
Turret Rear
βmm
View Range
270m
Turret Traverse
βΒ°/s
Signal Range
750m