X
T110E3
In 1954, a conference on future heavy tanks was held in Detroit. Alongside other advanced projects, the Chrysler Corporation suggested a new tank on the basis of the TS-31 project. The main goal was to make the tank fit the Bern national tunnel. Several variants were considered, but the project was canceled.
●
6,100,000
Credits
Modules
Gun
Engine
Suspension
Radio
Performance Stats
Firepower
Caliber
155mm
Damage (avg)
750HP
Penetration (avg)
295mm
Reload Time
18.00s
Aim Time
2.70s
Dispersion
0.360m
Rate of Fire
3.33/min
Depression
8Β°
Elevation
16Β°
Mobility
Top Speed
24km/h
Reverse Speed
8km/h
Hull Traverse
24Β°/s
Engine Power
875HP
Engine Fire Chance
0.2%
Survivability
Hit Points
1950
Hull Front
305mm
Hull Sides
76mm
Hull Rear
38mm
Turret Front
βmm
Turret Sides
βmm
Turret Rear
βmm
View Range
370m
Turret Traverse
βΒ°/s
Signal Range
745m